Monday, November 06, 2017

Garden office installed in four hours


Family-run, Gosport-based CS Garden Offices are proud of their speed in putting together timberless garden offices, most recently a 2.6m x 2.4m one done from start to finish in under four hours (more photos here). Here's what they say about their construction techniques:
Coldstream use 75mm thick foam injected polyurethane insulated panels for our garden offices manufactured in high pressure presses, exclusively within our own factory here in the UK. The polyurethane core in addition to providing very high insulation does not absorb water, is rot proof and vermin proof! The very high insulation value of Coldstream buildings brings major cost savings on heating in the winter and gives a comfortable environment on hot summer days. The Coldstream cam locking panels can be easily dismantled and re-erected in another location if required.
--------------------------------------------------------------------
Monday posts are sponsored by garden2office, the Swedish garden office specialists. Click here for more details.

No comments:

Post a Comment